Renovation Contractor in Miami Beach, FL
Deco and oceanfront condos and older Miami Beach houses, planned around the Historic Preservation Board, the Design Review Board and the city's strict 50% rule.
Miami Beach, Florida
Miami Beach has some of the most varied housing in South Florida: Art Deco and MiMo apartment buildings, oceanfront condo towers, and single-family houses from the 1920s and 1930s on streets like North Bay Road, Prairie Avenue and Hibiscus Drive. What you can do to any of them depends heavily on where the property sits on the city’s preservation and flood maps.
We have renovated condo apartments in Miami Beach buildings, and our house work elsewhere, such as the Hollywood Lake House, a 1960s waterfront home taken back to structure, is the kind of project many Miami Beach owners are weighing.
The short version: find out which board has jurisdiction over your property, and how close your plans are to the 50% flood threshold, before you pay for design.
Historic districts and the Historic Preservation Board
Miami Beach has a long list of locally designated historic districts. The city’s designation reports include Espanola Way, Ocean Drive/Collins Avenue, Flamingo Park, Museum, Altos del Mar, Ocean Beach, Harding Townsite/South Altos del Mar, Palm View, Collins Waterfront, North Beach Resort, Flamingo Waterway, Morris Lapidus/Mid-20th Century, North Shore and Normandy Isles. Individual sites are designated as well, such as Old City Hall and the Venetian Causeway.
Properties in those districts, and designated sites, fall under the Historic Preservation Board rather than the Design Review Board. If you own a house in Palm View or Flamingo Park, or an apartment in a Deco building on the Ocean Drive/Collins corridor, plan for the possibility that exterior changes such as windows, doors, additions or façade work will need HPB review, and confirm the scope with Planning staff. We would check the designation before drawing anything.
Older buildings also bring older systems. In a condo renovation inside a Deco or MiMo building, we plan for shared risers, uneven slabs and association rules, which our article on Miami condo rules walks through.
Outside the districts: the Design Review Board
Properties outside designated historic districts and sites go to the Design Review Board when design review is required. The DRB also grants variances in hardship cases, hears appeals of the planning director’s decisions, and serves as the city’s floodplain management board for properties within its jurisdiction.
Many of the city’s older single-family houses sit outside the historic districts. The DRB has heard demolition requests for pre-1942 single-family homes on streets such as North Bay Road, Prairie Avenue and Hibiscus Drive. If you own an older house, a renovation that keeps the original structure may face a different review path than a teardown, and it is worth discussing with the Planning Department before choosing one. Our guide to renovating an older Florida home covers the structural side.
Why the 50% rule is stricter here than owners expect
The City of Miami Beach reports that 93% of buildings in the city are in a FEMA Special Flood Hazard Area. If a house is improved or repaired by 50% or more of its building market value, the lowest floor has to be raised to current elevation requirements and every part of the structure must comply.
Miami Beach tracks this cumulatively. The city adds up the job values of all City of Miami Beach building permits issued over the past year and divides by the property value from the Miami-Dade Property Appraiser or a certified depreciated-replacement-cost appraisal. Splitting a big renovation into smaller permits a few months apart does not reset the count.
If you are buying, look up the property’s permit history on the city’s Civic Access portal before you close. The city describes its formula as counting the building permits issued in the past year, and it does not say that permits pulled by a previous owner are left out. A seller’s recent renovation could leave you with less room under the threshold than you assumed.
For a luxury renovation of an older house, this is often the deciding number. We would establish the market value and the likely job value early, then decide with you whether to stay under the threshold, elevate, or build new. Our article on the FEMA 50% rule goes deeper.
Our services in Miami Beach
Deco and oceanfront condos, bayfront houses, and the board process that comes with them.
- Condo renovation
- Luxury renovation
- Home renovation
- Kitchen remodeling
- Bathroom remodeling
- Additions & structural
- New construction
- Flooring & tile
Or call (646) 660-4457 — Sun–Fri, 7am–8pm
Local rules
Permits and approvals in Miami Beach.
Who issues permits. The City of Miami Beach Building Department issues building permits and runs inspections. Applications, plan status, inspection requests and fee payments go through the city’s Civic Access (Citizen Self Service) portal, which also has a fee estimator and lets you search permit history by folio number. That history matters, because it feeds the 50% calculation.
Land use boards. Miami Beach has four land use boards: the Historic Preservation Board, the Design Review Board, the Planning Board and the Board of Adjustment. Each publishes a 2026 application guide. Which board you need depends on the property’s designation and the type of approval, so confirm it with Planning before you commission drawings.
- Residential construction noise hours: 8 a.m. to 6 p.m. on weekdays, and 10 a.m. to 4 p.m. on Saturdays.
- Commercial and mixed-use zones: 7:30 a.m. to 6:30 p.m. in standard time, extended to 7:30 p.m. in daylight saving time.
- Sundays and national holidays: no construction noise allowed.
- Fines: $250 for a first violation, $1,500 for a second, $3,000 for a third, rising from there.
Flood review. The Building Department offers free technical assistance and recommends an elevation certificate for any property where flood risk is in question. For houses, request one before design starts.
The association layer. In condo buildings, the board’s own hours and approvals sit on top of the city’s. Many associations do not allow the Saturday window the city permits, so a South Beach or Mid-Beach apartment job is usually planned as a five-day week from the start. We would rather put that in the schedule on day one than promise a finish date the building will not let us meet. Buildings three habitable stories or taller are also subject to Florida’s milestone inspections; see our guide to milestone inspections for condo owners.
Nearby work
Work that maps onto Miami Beach projects.
Questions
Renovating in Miami Beach.
How does Miami Beach calculate the FEMA 50% rule?
The city adds the job values of all City of Miami Beach building permits issued in the past year and divides that by the building’s value from the Miami-Dade Property Appraiser or a certified depreciated-replacement-cost appraisal. At 50% or more, the project is a substantial improvement and the entire structure must meet current flood and building code requirements, which can include elevating the lowest floor.
What hours can contractors work in Miami Beach?
In residential zones, construction noise is allowed from 8 a.m. to 6 p.m. on weekdays and from 10 a.m. to 4 p.m. on Saturdays. No construction noise is allowed on Sundays or national holidays. Commercial and mixed-use zones allow 7:30 a.m. to 6:30 p.m., or 7:30 p.m. in daylight saving time. Condo buildings often set shorter hours of their own.
Does my renovation go to the Historic Preservation Board or the Design Review Board?
Properties in a locally designated historic district, or designated as historic sites, are under the Historic Preservation Board. Properties outside them go to the Design Review Board when design review is required. The city publishes its designation reports online, and the Planning Department can confirm which board, if any, applies to your scope before you commission drawings.
Is my Miami Beach home in a flood zone?
Probably. The city reports that 93% of its buildings are in a FEMA Special Flood Hazard Area. You can check a specific address on Miami-Dade County’s flood zone map, and the city recommends getting an elevation certificate. For any significant renovation of a house, the flood zone and the 50% calculation should be settled before design starts.
How do I apply for a building permit in Miami Beach?
Applications go through the city’s Civic Access (Citizen Self Service) portal, where you can upload plans, track status, pay fees and request inspections. If the work needs board approval, that comes first. When we manage a project, we coordinate the drawings, the board submittal if required, the permit and the inspections, along with the condo association’s approval where there is one.
Reviews
Rated 5.0 by every client who left a review.
“Yosef was really amazing in our bathroom update. Punctual, clean and did really great work. Went above and beyond when we had an issue. Would definitely hire again — strongly recommend.”JLJill Lavin · Google
“Great company to work with from start to finish. Quality work, fair pricing, and excellent communication.”SYSagi Yaakov · Google
“We were super happy with Yosi and we will definitely use him again. He helped renovate a bedroom, including repairing damage we thought was permanent.”BFBrian Foster · Google Local Guide
Also serving
Nearby areas.
Surfside · Bal Harbour · Bay Harbor Islands · Miami Shores · Key Biscayne, or see every area we serve.
Let’s talk
Tell us about your project.
A free visit, a real conversation, and a written price. Hire us and sleep well at night, knowing your project is in good hands.
Licensed & Insured · CGC1542389 · Condo & HOA-Approved
Request a free estimate
We usually reply the same day.
No obligation, no pressure.